Highlights of Projects
INTEL VIETNAM
Project Scope
- System Rectification and Upgrading Package
- Improving Central Control System and designed to compatible with FCC
- LPG Supply
- Proactive Safety: Comprehensive maintenance + Yearly risk assessment + Yearly safety training
Achievement:
Monthly LPG consumption saving of over 15% compared to previous supplier.
HILTON SAIGON
Project Scope
- Design and Installation
- Legal coverage, including Fire Approval and Acceptance Certificate
- LPG Supply
- Proactive Safety: Comprehensive maintenance + Yearly risk assessment + Yearly safety training
Achievement:
Monthly LPG consumpCollaborating with Architectural Contractor to meet technical and safety requirements, while also designing a facade solution for the vertical pipe work outside the Hotel (7th to 32nd floor) that aligns with Hilton's premium architectural concept.
MALIBU HOI AN
Project Scope
- Design and construction
- Legal coverage, including Fire Approval and Acceptance Certificate
- LPG Supply
- Comprehensive maintenance
- Proactive Safety: Comprehensive maintenance + Yearly risk assessment + Yearly safety training
Achievement:
Special installation method to prevent metal equipment and materials from deteriorating due to Atmospheric Corrosion in the air.
SAIGON CENTRE/TAKASHIMAYA
Project Scope
- Design, construction, and operation
- Legal coverage, including Fire Approval and Acceptance Certificate
- Proactive Safety: Comprehensive maintenance + Yearly risk assessment + Yearly safety training
Achievement:
Proactive safety solutions for potential LPG leaks in basements.
Optimal customized service: 2 on-site shifts/day, 15-minute response, skilled technicians. Zero operation cost for the Owner with new operation model to prevent any downtime for the Food court.
MEDICAL UNIVERSITY HOSPITAL
Project Scope
- Design and construction
- Legal coverage, including Fire Approval and Acceptance Certificate
- LPG Supply
- Comprehensive maintenance
Achievement:
Investment cost saved 30% compared to tendered approval.
TCL VIETNAM
Project Scope
- Design and construction
- Legal support for Fire Acceptance Certificate
- Safety improvement package: Concrete barrier from container truck assembly points
- LPG Supply
- Comprehensive maintenance
Achievement:
Supply and operational security: Backup cylinder system during COVID-19 pandemic and Fire Acceptance pending.
INTERCONTINENTAL HOTEL SAIGON
Project Scope
- LPG Supply, Re-design, rectifying and upgrading LPG system
- Proactive Safety: Comprehensive maintenance + Yearly risk assessment + Yearly safety training
Achievement:
Meeting strict HSE requirements of IHG's standards.
Switching from an underground LPG bulk system to an LPG cylinder withdrawal system while securing LPG supply at maximum consumption capacity.
Successfully obtaining Fire Approval and Acceptance Certificate.
FUJI SEAL VIETNAM
Project Scope
- Upgrading LPG cylinder withdrawal system
- LPG Supply
- Comprehensive maintenance
Achievement:
Redesigning the system to meet operational security via technical and safety improvements.
ALMA
Project Scope
- Consulting, Re-designing and Installing the underground LPG system, including back up LPG cylinder system
- Commercial LPG Supply and Full maintenance and Safety package
Achievement:
Fire Re-Approval and Acceptance by Fire & Rescue Department.
Improving supply security, operational cost, and safety by replacing buried pipes with above-ground seamless pipes to extend the lifetime quality of the pipe work.